Costco North Mississauga Second Story Demolition
This was a very unique demolition project where we were tasked with removing a 20,000 square feet second story above a Costco that was previously used for office space. The second story was built as an addition on top of the existing store and was removed in the same manor. Extreme caution and creative problem solving were used to eliminate risk to the customer and their property while keeping a reasonable schedule. The store below the project was in full operation during this demolition causing a lot of the project to be performed off the regular hours.
